Projects - Brazil
Hollywood Project
|
Licence |
Type |
Grant Date |
Holder |
Interest Earning or Held |
Royalty |
Future |
|
850083 |
EL |
26/04/2011 |
CMGM |
100% |
N/A |
N/A |
The Project area covers 6,874Ha.
The Hollywood Project is located less than 75km
southwest from the Palito and São Jorge gold deposits, also within
the Tocantinzinho Structural Corridor. Locally large scale
alluvial mining activity has exposed various quartz veined
structures. The Hollywood and nearby St Dumon artisanal mining
centres active during the 1970s, are still subject to artisanal
mining activities.
The Hollywood Garimpo alluvial deposits have been mined along 15kms of a major drainage valley. One tributary was inspected and the mullock from sluicing operations was sampled. The coarse mullock left behind after sluicing, ranging from white bucky quartz to highly pyritic breccia, assayed in the range 0.26 - 0.60g/t Au.

Hollywood Project mineralised quartz veins
